Feed

Join us for your next round at Metro Vancouver's Premier Public Golf Course!

  • 1

    Sticky

    News
    Mar 1, 2023

    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate

  • 2

    CONSTRUCTION

    Traffic - major
    Mar 3, 2026 - 01:38 PM
    Highway 1 (TransCanada Highway), in both directions. Bridge maintenance at Second Narrows Bridge (North Vancouver - District). Until Tuesday, March 17. From 9:00 PM to 5:00 AM daily. Watch for traffic control. Expect delays. Traffic will flow one lane in each direction on the westbound side. Weather dependent. Alternate route via the Lions Gate Bridge. Next update time Tuesday, March 17 at 5:00 AM. Last updated Saturday, March 7 at 12:29 PM.
  • 3

    CONSTRUCTION

    Traffic - minor
    Feb 27, 2026 - 03:04 PM
    Highway 1 (TransCanada Highway), westbound. Electrical maintenance planned between Douglas Rd and Exit 29: Willingdon Ave (Burnaby). Starting Monday, March 16 until Friday, March 20. From 10:00 PM to 5:00 AM daily. HOV lane will be closed. Watch for traffic control personnel. Last updated Friday, February 27 at 3:04 PM.
  • 4

    CONSTRUCTION

    Traffic - minor
    Feb 25, 2026 - 02:40 PM
    Main St, westbound. Electrical maintenance planned between Mountain Hwy and Highway 1 in North Vancouver - City. Starting Monday, March 16 at 9:00 AM until Monday, March 16 at 3:00 PM. Right lane will be closed. Watch for traffic control personnel. BC Hydro Maintenance Operations. Last updated Wednesday, February 25 at 2:40 PM.
  • 5

    CONSTRUCTION

    Traffic - minor
    Jan 22, 2026 - 01:53 PM
    Highway 1 (TransCanada Highway), eastbound. Road construction work between Exit 18: Lonsdale Ave and Exit 19: Lynn Valley Rd (North Vancouver - City). Until Friday, July 31. From 7:00 AM to 5:00 PM daily. Right lane of eastbound on-ramp closed. Last updated Thursday, January 22 at 1:53 PM.
  • 6

    Example

    Update
    Mar 10, 2023

    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate

    Example
  • 7

    Another Example

    Announcement
    Mar 9, 2017

    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate

    Another Example